Network Rail

  Location – Hatfield Colliery Sector – Rail   The Situation Hatfield Colliery near Doncaster suffered a huge landslide in February 2013 resulting in all freight and passenger services between Doncaster and Scunthorpe until at least July the same year....

Vinci SA

Location – Nottingham Railway Station Multi Story Car-park   The Situation Black Diamond Security was selected to provide a package of security solutions by VINCI Construction UK, a national construction and facilities company which is part of VINCI, a world...

First Trans Pennine

The Situation Black Diamond Security needed to provide a variety of services in support of First Trans Pennine (FTP), on three sites Preston Sidings, Barrow – in – Furness and Grimsby Train Station. Each site requied a variety of pro and reactive systems to be in...

InterTrain

The Situation InterTrain is situated on a mixed use office space covering 4 acres. When they moved in, the total security & protection of the buildings was lacking. Therefore, they needed a security company that would give advice on the current location. Due to...

GB Rail Freight

The Situation GB Rail Freight were expanding Roberts Road Freight Depot from Network Rail. The site had been left vacant for some time and as a consequence had been completely stripped of cabling, and anything remotely valuable. Prior to official handover all...

Sersa Group

Location – Manchester MetroLink The Situation Sersa UK took a weekend possession of the Manchester Metrolink to carry out critical works for their client Greater Manchester Passenger Transport Executive (GMPTE). When works are needed within the public arena, a...